• 其他栏目

    江小燕

    • 副教授 硕士生导师
    • 教师拼音名称:Jiang Xiaoyan
    • 入职时间:2002-07-01
    • 所在单位:建筑工程系
    • 学历:博士研究生毕业
    • 办公地点:纬地楼609A
    • 性别:女
    • 学位:博士学位
    • 在职信息:在职
    • 毕业院校:合肥工业大学

      访问量:

      开通时间:..

      最后更新时间:..

      个人简介

      博士,副教授,注册造价工程师,注册一级建造师,注册监理工程师,英国皇家测量师协会会员(MRICS),安徽省建设工程造价协会常务理事,中华建设管理研究会会员,昆士兰科技大学访问学者


      研究兴趣

      建设项目全寿命期可持续性管理;低碳管理与碳排放评估方法;装配式建筑供应链管理;BIM技术与智能建造;建设工程项目成本大数据研究


      近三年发表的主要论文(通讯作者用*标出)

      [1] Zhang Yubing,Jiang Xiaoyan*, Cui Caiyun, & Skitmore, M. BIM-based approach for the integrated assessment of life cycle carbon emission intensity and life cycle costs[J]. Building and Environment, 2022, 226: 109691.(SCI)

      [2]Jiang Xiaoyan*, Wang, S., Liu, Y., Xia, B., Skitmore, M., Nepal, M., & Ghanbaripour, A. N. . A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 2022, (ahead-of-print) . (EI)

      [3]Jiang Xiaoyan*, Sun, H., Lu, K., Lyu, S., & Skitmore, M.. Using evolutionary game theory to study construction safety supervisory mechanism in China. Engineering, construction and architectural management, 2022.(SCI&SSCI)

      [4]Lu K,Jiang Xiaoyan*, Yu Jingyu, et al. Integration of Life Cycle Assessment and Life Cycle Cost using Building Information Modeling: A Critical Review[J]. International journal of cleaner production, 2021. (SCI)

      [5]Cui Caiyun, Yong Liu, Bo Xia,Jiang Xiaoyan, Overview of public-private partnerships in the waste-to-energy incineration industry in China: status, opportunities, and challenges [J]. Energy Strategy Reviews, 2021. (SCI)

      [6]Xia, Bo, Olanipekun, A., Hu, X., Chen, Q.,Jiang, Xiaoyan, & Liu, Y. Optimising Facilities Provision in Retirement Villages-A Case Study in Australia[C]//International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore, 2021: 1225-1236.

      [7]Jiang Xiaoyan*, Ouyang, W., Dai, X., Hu, K., Liu, Y., & Xia, B. A Framework of BIM-Based Value for Money (VFM) Evaluation Methods of PPP Projects at Decision-Making Stages[C]//International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore, 2021: 797-807.

      [8]Jiang Xiaoyan*, Yao X.R., Lyu S.N. Review of the Quantitative Analysis Methods for Social Life Cycle Assessment in Construction.[C]//International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore, 2020: 1263-1274.

      [9]Jiang Xiaoyan*, Wang S, Wang J, et al. A decision method for construction safety risk management based on ontology and improved CBR: example of a subway project[J]. International journal of environmental research and public health, 2020, 17(11): 3928. (SCI&SSCI)

      [10]Yu Jingyu, Ma Guixia, andJiang Xiaoyan. Impact of Critical Factors within Decision Making Process of Public Engagement and Public Consultation for Construction Projects – Case Studies[J]. International Journal of Construction Management, 2020 (SCI)

      [11]Jiang Xiaoyan*, Kun Lu, Bo Xia, Qing Chen. Research Trend of Psychological Contract in Construction Management.[C]//International Symposium on Advancement of Construction Management and Real Estate. Springer, Singapore, 2019: 765-776.

      [12]Cui C, Sun C, Liu Y,Jiang Xiaoyan, et al. Determining critical risk factors affecting public‐private partnership waste‐to‐energy incineration projects in China[J]. Energy Science & Engineering, 2020, 8(4): 1181-1193. (SCI&SSCI)

      [13]Cui C, Liu Y, Xia B,Jiang Xiaoyan, Skitmore, M. . Overview of public-private partnerships in the waste-to-energy incineration industry in China: Status, opportunities, and challenges[J]. Energy Strategy Reviews, 2020, 32: 100584.(SCI)

      [14]Jiang Xiaoyan*, Lu K, Xia B, et al. Identifying Significant Risks and Analyzing Risk Relationship for Construction PPP Projects in China Using Integrated FISM-MICMAC Approach[J]. Sustainability, 2019, 11(19): 5206. (SCI&SSCI)

      [15]Lu K,Jiang Xiaoyan*, Tam V W Y, et al. Development of a Carbon Emissions Analysis Framework Using Building Information Modeling and Life Cycle Assessment for the Construction of Hospital Projects[J]. Sustainability, 2019, 11(22): 6274. (SCI&SSCI)

      [16]Jiang Xiaoyan*, Hu Kang, Zheng Xinhua, Liu Yong, Xia Bo and Skitmore Martin. BIM-based Operation and Maintenance Management System for Smart Industrial Parks—A Case Study in China[M]//INNOVATIVE PRODUCTION AND CONSTRUCTION: Transforming Construction Through Emerging Technologies. 2019: 557-568.

      [17]Liu, Y., Ge, Y., Xia, B., Cui, C.,Jiang Xiaoyan, & Skitmore, M.. Enhancing public acceptance towards waste-to-energy incineration projects: Lessons learned from a case study in China[J]. Sustainable Cities and Society, 2019, 48: 101582. (SCI&SSCI)

      [18]Xia Bo, Zainal Nur, Drogemuller Robin, Xie Linlin, Liu Yong andJiang Xiaoyan. Corporate Social Responsibility (CSR) Reporting Practices in the Australian Construction Industry[M]//Innovative Production And Construction: Transforming Construction Through Emerging Technologies. 2019: 367-384.


      发明专利

      江小燕,胡康,王明辉,欧阳文峰,闫碧琼;基于BIM的建筑工程智能投标决策管理系统,2021-05-18,中国,ZL201810276808.0

      江小燕,胡康,王明辉,欧阳文峰,闫碧琼;基于DEA-GA-BP的智能评标决策系统和评标方法,2022-03-4,中国,ZL201810277019.9


      专著/教材/参编规程

      工程造价管理,北京大学出版社,ISBN:9787301318577 (2021)

      PPP社会资本方操作实务,中国建材出版社,ISBN:9787516026380 (2019)

      建设工程计量与计价实务(土木建筑工程),中国建材工业出版社,ISBN:9787518206346 (2019)(参编)

      《建设工程招标控制价编审规程》国家标准CECA/GC 6-2011 (参编)

      《施工组织设计,合肥工业大学出版社

      《土木工程毕业设计指导》,合肥工业大学出版社


      主持的主要科研项目

      全过程咨询背景下工程监理企业碳价值链以及低碳竞争力研究,W2022JSFW0358

      基于BIM的装配式建筑产业链和全寿命周期成本LCC研究,W2021JSZX0653

      考虑适老性的医养项目全生命周期低碳管理的策略及技术研究,W2021JSFW0885

      中铁四局工程总承包能力建设研究,W2019JSZX0382

      基于BIM和物联网的智慧工地综合管理系统研究,W2019JSKF0091

      基于PPP模式的基础设施项目资本结构的选择研究,JS2016AHST0011

      PPP项目社会资本方操作实务研究,W2018JSZX0230

      PPP项目风险识别及防范研究,W2018JSZX0002

      BIM技术与精益建造LC协同应用研究,JZ2015HGBZ0513

      科技项目招投标管理政策的完善研究,JS2014AKRK0021

      合肥公共资源交易中心工程造价及评审办法,W2014JSZX0536


      招生信息

      欢迎对工程项目可持续管理和智慧建设有兴趣的同学报考硕士研究生











      Baidu
      map